Base volume is area times depth, multiplied by one plus your waste percentage, at 2000 kg per cubic metre of compacted base. Pavers are counted at 0.02 square metres each for a 200 x 100 mm unit, in metric units.
A zero or negative area or depth is refused by name, and a waste percentage above 50 is refused. The waste percentage is printed on the answer line, so the ordering quantity can be re-derived.
Every figure is an ordering estimate, not a structural specification, and none of it replaces an engineer's take-off. The arithmetic runs in your browser: nothing is uploaded and nothing is stored, so the same input prints the same answer on every reload.
Base volume is area × depth, multiplied by one plus your waste percentage, at 2000 kg per cubic metre of compacted base; pavers are counted at 0.02 m² each for a 200 × 100 mm unit. Twenty square metres over 150 mm with 10 percent waste therefore reads 3.3 m³ of base, 6600 kg, and 1100 pavers, in metric units.
Metric compacted base and paver count, each with the waste allowance.
An ordering estimate, not a structural specification.
How to use it
Enter the paved area in square metres, the base depth in metres and a waste percentage, then press Run. The page prints the base volume and tonnage with the density it used, and the paver count with its face size.
Waste and units
2000 kg/m³ is the compacted density the page assumes, which is why the volume is a compacted volume rather than a loose one. The paver face of 0.02 m² comes from 200 × 100 mm, and the waste percentage covers cuts at edges and breakages, so it applies to the paver count as well as the base.
Where the page stops
A zero or negative area or depth is refused by name, and a waste percentage above 50 is refused. The page assumes a single compacted depth: a layered sub-base, a geotextile or an edging course is outside it, and the density is an average rather than a test result.
What to Expect
Best for
- Ordering base material and pavers for a patio or path.
- Seeing the compacted tonnage and the paver count together.
What this tool keeps
- The density and the paver face print, so both counts can be re-derived from the area.
What may need cleanup
- Nothing: the tonnage and the paver count are the whole output.
Sample input
20 m², 0.15 m base, 10 percent waste
Sample output
Base: 20 × 0.15 = 3 m³ With 10 percent: 3.3 m³ at 2000 kg/m³ = 6600 kg Pavers: 20 ÷ 0.02 = 1000, with 10 percent = 1100
Frequently asked questions
How much base and how many pavers?
Enter area, base depth and a waste percentage, then press Run. The page prints the compacted base volume and tonnage and the paver count.
Is anything uploaded?
No. Everything is computed in this tab, so nothing is sent, nothing is saved and no account is used.
What density and paver size does it assume?
2000 kg per cubic metre of compacted base, and a 200 × 100 mm paver at 0.02 m² each. Both are printed so a different product can be substituted by hand.
Is this a structural specification?
Every figure here is an ordering estimate, not a structural specification: it sizes a purchase, and an engineer's take-off or the manufacturer's data governs what is actually built.
Build custom tools for your store
Join the SDK program to create useful ecommerce utilities for your store.