The in-situ volume is length times width times depth in metres. The percentage field is read as bulking - soil swells when dug - so the loose volume is the larger figure, and both are printed in metric units.

A zero or negative dimension is refused by the field it was typed in, because a trench with no depth holds nothing. The page says plainly that the waste field is bulking here, not a purchase allowance.

Every figure is an ordering estimate, not a structural specification, and none of it replaces an engineer's take-off. The arithmetic runs in your browser: nothing is uploaded and nothing is stored, so the same input prints the same answer on every reload.

The in-situ volume is length × width × depth in metres, and the percentage field is read as bulking — soil swells when it is dug — so the loose volume is the larger figure and both are printed. A 6 × 0.6 × 1.2 m trench at 25 percent bulking therefore reads 4.32 m³ in situ and 5.4 m³ loose, in metric units.

Metric trench volume in situ and bulked loose, with the percentage named as bulking.

An ordering estimate, not a structural specification.

How to use it

Enter trench length, width and depth in metres and the bulking percentage, then press Run. The page prints the in-situ volume, the loose volume and the percentage it applied.

The percentage here is bulking

This is the one page in the pack where the percentage is not a purchase allowance. Soil displaces more once it is dug, so the loose volume is larger than the hole it came from, and the page says plainly that the field is bulking rather than waste — the two are opposite in intent even though both scale the figure.

Where the page stops

A zero or negative dimension is refused by the field it was typed in, because a trench with no depth holds nothing. Bulking varies with soil type and moisture, and the page takes the percentage you give it rather than guessing one; it also does not model a spoil heap, a trench box or backfill compaction.

What to Expect

Best for

  • Sizing a trench cut and the spoil it will produce.
  • Converting an in-situ volume into a loose haulage volume.

What this tool keeps

  • Both volumes and the percentage print, so the bulking factor can be swapped and rechecked.

What may need cleanup

  • Nothing: the two volumes are the whole output.

Sample input

6 m × 0.6 m × 1.2 m, 25 percent bulking

Sample output

In situ: 6 × 0.6 × 1.2 = 4.32 m³ Bulking 25 percent: 4.32 × 1.25 = 5.4 m³ loose

Frequently asked questions

How much soil will the trench produce?

Enter length, width and depth in metres and a bulking percentage, then press Run. The page prints the in-situ volume and the larger loose volume it becomes.

Is anything uploaded?

No. The multiplication runs in this tab, so nothing is posted, nothing is kept and no account is used.

Is the percentage waste or bulking?

Bulking. Soil swells when dug, so the loose figure is larger than the hole; the page names the field as bulking so it is not read as a purchase allowance.

Is this a structural specification?

Every figure here is an ordering estimate, not a structural specification: it sizes a purchase, and an engineer's take-off or the manufacturer's data governs what is actually built.

Developer program

Build custom tools for your store

Join the SDK program to create useful ecommerce utilities for your store.