Reorder Point Calculator
Work out the stock level that triggers a replenishment order from average daily demand, lead time (days), safety stock. Reorder point = daily demand × lead time + safety stock, and the page prints the substitution so the result can be checked by hand.
Reorder Point Calculator
Work out the stock level that triggers a replenishment order from average daily demand, lead time (days), safety stock. Reorder point = daily demand × lead time + safety stock, and the page prints the substitution so the result can be checked by hand.
How this page computes
Reorder point = daily demand × lead time + safety stock
Lead-time demand is what is expected to sell before the order arrives; the safety stock covers the days it sells faster. The sum is the level at which the next order has to be placed.
The page assumes demand and lead time are averages, not distributions; the safety-stock page is where the distribution enters.
The calculation runs entirely in this browser tab; nothing is uploaded.
Reorder Point Calculator computes the stock level that triggers a replenishment order. Reorder point = daily demand × lead time + safety stock. The page prints the rule, the numbers substituted into it and the result, so the arithmetic can be checked by hand.
Lead-time demand is what is expected to sell before the order arrives; the safety stock covers the days it sells faster. The sum is the level at which the next order has to be placed. Pressed with average daily demand 40, lead time 7, safety stock 120, it answers: Reorder point = 400 units
How to use Reorder Point Calculator
Enter average daily demand 40, lead time 7, safety stock 120, then press Run: the page evaluates the stock level that triggers a replenishment order and prints every line of the working. Typed input is read exactly as written, and a blank field is refused with its name.
Read the first line as the answer and the lines below it as the substitution. If a value is out of range the page refuses it by field and reason instead of printing a number.
With average daily demand 40, lead time 7, safety stock 120, the answer is Reorder point = 400 units.
Why the buffer is added
Lead-time demand is what is expected to sell before the order arrives; the safety stock covers the days it sells faster. The sum is the level at which the next order has to be placed.
The page assumes demand and lead time are averages, not distributions; the safety-stock page is where the distribution enters.
What to Expect
Best for
- Working out the stock level that triggers a replenishment order without a spreadsheet
- Checking a figure someone else quoted
- Seeing the formula behind an answer
Not ideal for
- Zero demand or zero lead time is refused, because the point would be only the buffer.
- A quantity the page cannot compute, which it refuses instead of estimating
- Rounding an answer that has an exact form
What this tool keeps
- Reorder point = daily demand × lead time + safety stock
- Every input exactly as typed
What may need cleanup
- Nothing: the printed answer is the final output
- A unit conversion, if the inputs were entered in different units
Common errors
- Zero demand or zero lead time is refused, because the point would be only the buffer.
- An empty field is refused with the field's name
Example use cases
- Work out the stock level that triggers a replenishment order for one set of inputs
- Check the result against the formula by hand
- See which input the answer is most sensitive to
Sample input
Reorder Point Calculator: average daily demand 40, lead time 7, safety stock 120
Sample output
Reorder point = 400 units — Demand during lead time = 40 per day × 7 days = 280
Who this is for
- Students checking a formula
- Anyone who needs the number and the working
Frequently asked questions
What formula does this page use?
Reorder point = daily demand × lead time + safety stock. The page prints the substitution as well, so the answer can be checked against the rule.
What does Reorder Point Calculator refuse?
Zero demand or zero lead time is refused, because the point would be only the buffer.
What does the default example give?
Average daily demand 40, lead time 7, safety stock 120 gives Reorder point = 400 units. Every line below that restates the same arithmetic.